Skip to content

Castle Park High School

K-12 · Chula Vista, CA

13 classrooms in a new building

Scope of work

Two buildings demolished and two portable buildings removed for a new two-story classroom building, and the student quad at the heart of the campus upgraded.

Client
Sweetwater Union High School District
Architect
HED Architecture
Delivery method
Design-Bid-Build

The new classroom building

  1. 13 classrooms
  2. An administrative and counseling office
  3. An ASB workroom
  4. Restrooms

The student quad

  1. An outdoor stage
  2. Six shade structures
  3. Redesigned walkways
  4. Concrete tables and benches
  5. Ornamental landscaping and paving

Have something similar in the works?

Tell us what you are planning and where it stands, and we will talk through how we would build it.

Call us (760) 512-1188